The Original Airstream E-mail List

The Original Airstream E-mail List

Archive Files


[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: [A/S] Floor repair



Joy, the sketches you talked about would be great. I
have already removed the belly pan on the aft end and
had a new aft cross member near the bumper welded in
by a welding shop. They did a great job. The frames
running fwd to aft are in good shape. I've had a sheet
metal shop fabricate a new holding tank pan for me. I
have already contiplated splitting the inner skin up
from the floor about 8 to 10 inchs,and reattaching
with a splice. This area is all hidden anyway. I have
already been working on my project off and on about a
year now. I am a Contract Engineer and I have to
travel sometimes. When I travel I am using my 30ft 5th
wheel right now until I get the Safari done.

Thanks again
George
66 Safari